Projects

First prototype was installed on the locomotives GE-C36-7i, and GE-C30-7Ai at 2002 summer. Totally 77 locomotives in Estonia, 77 single systems. Upgrade of systems was 2012.
Duration: 2002-2004

2 Chinese locomotives DF7G-E, First double system, Version 1.6.
Beginning 2012

 

New passenger fleet in Estonia. Version 2.0, 36 trains 72 systems, Speed up to 180 Km/h, Digital DATA interface to loco, Up to 4 trains in one Network, Internal powerful diagnostic, Maintenance free system.
Duration: 2012-2014
Collaboration: Stadler AG, ELRON

V.E.P.S. System Version 3.0 for AZ4A and AZ8A developing started 2015 (10 AZ4A and 40 AZ8A)
Duration: 2015-2016

 

Design and commissioning of Railway automation laboratory (Interlocking, Lx, ATP, Line block, Hot/Box), Stadler trains simulator
Duration: 2015-2018
Collaboration: Siemens AG, Tallinn Technical University

Update of FLIRT trains ATP system software (new safety functions)
Collaboration: Stadler AG, ELRON
Beginning 2016

 

Design and manufacturing of the level crossing systems.
Collaboration: Estonian Ministry of defense
Beginning 2016

 

Predesign of the Rail Baltic High speed Line Level 2 (ERTMS-L3, Radio, power, Catenary, power station), 280 Km
Duration: 2016-2018
Collaboration: WSP Sweden, Rail Baltic Estonia

 

Design of VEPS ATP for C30M locomotives, manufacturing, installation
Duration: 2016-2020
Collaboration: EVR Cargo, CZ Loco

V.E.P.S. System Version 3.0 for AZ4A first in Baku October 2017
Beginning 2017

 

Update of FLIRT trains ATP system software (application of automated driving data analyzes)
Collaboration: ELRON
Beginning 2017

V.E.P.S. System Version 3.0 for AZ4A 4 and AZ8A Locomotives in November 2018
Beginning 2018

 

V.E.P.S. System Version 3.0 for AZ4A 4 and AZ8A 6 Locomotives December 2018
Beginning 2018

 

V.E.P.S. System Version 3.0 for AZ8A 7 locomotives in Kazastan (Astana)
Beginning 2018

 

Design and engineering of new generation ALSN Coding system DALS
Collaboration: Bombardier
Beginning 2018

 

ATP systems to Lithuanian fleet.
Collaboration: Lithuanian Railways
Beginning 2018

 

ATP system to the retro loco TGM
Collaboration: East-West Raylway
Beginning 2018

 

Design and engineering of new ATP system for the Alstoim new locomotives (50 locos)
Duration: 2018-2021
Collaboration: ALSTOM Transport

V.E.P.S. System Version 3.0 for AZ8A 33 locomotives in Kazastan (Astana)
Beginning 2019

 

ATP systems to Latvian fleet.
Collaboration: Latvian Railways
Beginning 2019

 

ATP systems for new C30M locomotives (4 locos)
Collaboration: Operail (Estonia)
Beginning 2019

 

Update of the C30 Locos ATP systems (22 locos)
Collaboration: Operail (Estonia)
Beginning 2019

Partners

error: Content is protected !!