First prototype was installed on the locomotives GE-C36-7i, and GE-C30-7Ai at 2002 summer. Totally 77 locomotives in Estonia, 77 single systems. Upgrade of systems was 2012.
Duration: 2002-2004
First prototype was installed on the locomotives GE-C36-7i, and GE-C30-7Ai at 2002 summer. Totally 77 locomotives in Estonia, 77 single systems. Upgrade of systems was 2012.
Duration: 2002-2004
2 Chinese locomotives DF7G-E, First double system, Version 1.6.
Beginning 2012
New passenger fleet in Estonia. Version 2.0, 36 trains 72 systems, Speed up to 180 Km/h, Digital DATA interface to loco, Up to 4 trains in one Network, Internal powerful diagnostic, Maintenance free system.
Duration: 2012-2014
Collaboration: Stadler AG, ELRON
V.E.P.S. System Version 3.0 for AZ4A and AZ8A developing started 2015 (10 AZ4A and 40 AZ8A)
Duration: 2015-2016
Design and commissioning of Railway automation laboratory (Interlocking, Lx, ATP, Line block, Hot/Box), Stadler trains simulator
Duration: 2015-2018
Collaboration: Siemens AG, Tallinn Technical University
Update of FLIRT trains ATP system software (new safety functions)
Collaboration: Stadler AG, ELRON
Beginning 2016
Design and manufacturing of the level crossing systems.
Collaboration: Estonian Ministry of defense
Beginning 2016
Predesign of the Rail Baltic High speed Line Level 2 (ERTMS-L3, Radio, power, Catenary, power station), 280 Km
Duration: 2016-2018
Collaboration: WSP Sweden, Rail Baltic Estonia
Design of VEPS ATP for C30M locomotives, manufacturing, installation
Duration: 2016-2020
Collaboration: EVR Cargo, CZ Loco
V.E.P.S. System Version 3.0 for AZ4A first in Baku October 2017
Beginning 2017
Update of FLIRT trains ATP system software (application of automated driving data analyzes)
Collaboration: ELRON
Beginning 2017
V.E.P.S. System Version 3.0 for AZ4A 4 and AZ8A Locomotives in November 2018
Beginning 2018
V.E.P.S. System Version 3.0 for AZ4A 4 and AZ8A 6 Locomotives December 2018
Beginning 2018
V.E.P.S. System Version 3.0 for AZ8A 7 locomotives in Kazastan (Astana)
Beginning 2018
Design and engineering of new generation ALSN Coding system DALS
Collaboration: Bombardier
Beginning 2018
ATP systems to Lithuanian fleet.
Collaboration: Lithuanian Railways
Beginning 2018
ATP system to the retro loco TGM
Collaboration: East-West Raylway
Beginning 2018
Design and engineering of new ATP system for the Alstoim new locomotives (50 locos)
Duration: 2018-2021
Collaboration: ALSTOM Transport
V.E.P.S. System Version 3.0 for AZ8A 33 locomotives in Kazastan (Astana)
Beginning 2019
ATP systems to Latvian fleet.
Collaboration: Latvian Railways
Beginning 2019
ATP systems for new C30M locomotives (4 locos)
Collaboration: Operail (Estonia)
Beginning 2019
Update of the C30 Locos ATP systems (22 locos)
Collaboration: Operail (Estonia)
Beginning 2019